1
/
of
9
Smart LED Ceiling Lights RGBCW Color Changing Ceiling Light Compatible with Alexa Google Home Flush Mount Ceiling Lamp 24W Time Scheduler Dimmable for Living Room, Bedroom
Smart LED Ceiling Lights RGBCW Color Changing Ceiling Light Compatible with Alexa Google Home Flush Mount Ceiling Lamp 24W Time Scheduler Dimmable for Living Room, Bedroom
Regular price
$27.99
Regular price
Sale price
$27.99
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
About This
- Voice Control: Compatible with CozyLife app, Amazon Alexa, Google Assistant and other SmartThings. Voice commands of smart device to turn on/off the light, and change the colors, lightness and the mode of lighting. (Alexa, turn on the living room light)
- APP Control: With Cozylife APP on your phone, you can take control of your smart home light anywhere and anytime at your will. Brings great convenience to your life.(only 2.4G WiFi supported and no hubs required)
- Sync with Music: Our mart ceiling lights can be activated up and down by the decibel of surrounding sound through micro phone function, but also jumping with the rhythm of music in different color. Enhance the romantic or joyful atmosphere for certain occasions.
- Group Control & Timer Schedule: You can create a group for all the lights in your home and easily customize your home lighting system. You can set multiple schedules for the smart ceiling lights according to your daily habits, and the lights have wake up & sleep mode.It will slowly dim/brighten over the timespan you set.
- RGBCW and Brightness Adjustable: RGBCW(2000K-6500K) enables choose any color you want from 16 million colors. The light brightness can be fixed from 1% - 100%, suits different occasions.
- Energy Saving: With Led technology smart bulb will reduce energy consumption up to 80% compared with ordinary bulb without losing brightness or quality which saves a lot of money. The lifespan of our smart bulbs can approximately last 50,000 hours. 12 months.
- NOTE: how to connect the remote to the dohome ceiling light: Press the WiFi button to the ceiling light within 10 seconds after the ceiling light powered on.
Overview
- Brand : DoHome
- Light Type : LED
- Special Feature : Color Changing
- Wattage : 24 watts
- Bulb Base : E26
