1
/
of
9
Tuya Smart Plug,Mini with Energy Monitoring,Pro Series 15A Plug,2.4G Wi-Fi Outlets Support Alexa, Google Assistant, Time Schedule,ETL & FCC Certified, 4 Pack
Tuya Smart Plug,Mini with Energy Monitoring,Pro Series 15A Plug,2.4G Wi-Fi Outlets Support Alexa, Google Assistant, Time Schedule,ETL & FCC Certified, 4 Pack
Regular price
$41.99
Regular price
Sale price
$41.99
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
About This
- [Monitor Energy and Schedule] Keep track of the real-time power on/off on the App. You can schedule connected home devices to turn on and off automatically by smart plugs, saving energy and cost when your deviece are not needed or left on by accident.
- [Flexible Scheduling & Timer] Effortlessly reduce energy usage with automatic device shutdown after a set time. For example Chrismas Tree, TV, Lamp, Fan, Humidifier,Blenders, Lightbulbs
- [Design with Safty and Compact] AiSeek alexa plugs are FCC certified with fire-resistant materials and provide 1800W 15A power capacity, as well as protection against short-circuits and overloads. Despite safety features, the smart outlet plug has a small form factor that won't take up too much space.
- [Easy set up and use]: 2.4GHz Wi-Fi connection required. Plug In, Open the SmartLife app, Follow the simple instructions and enjoy. SmartLife app reqiured
- [Group & Share Control] Grace to the convenient and efficient group control function, you can manage multiple smart plugs at the same time with just one click.
Overview
- Operation Mode : ON-OFF
- Current Rating : 15 Amps
- Operating Voltage : 120 Volts
- Contact Type : Normally Open
- Connector Type : Plug In
- Brand : AiSeek
- Switch Type : Smart Plug
- Terminal : Plug in
- Material : Polycarbonate
- Item dimensions L x W x H : 1.4 x 2.8 x 2 inches
